The dump truck is on the main line. The long curve before the 2 mile tanget to Washington Jct begins here. Camera is looking time table east. |
Date:
7/25/2009 |
Location:
Ellsworth, ME Map  |
Views:
191 |
Collection Of:

David Larrabee |
|
Author: David Larrabee
|
 |
Picture Categories: RollingStock,Yard,Track,Action |
This picture is part of album: Working on the Downeast Scenic RR |